Blatchford Bridge Repairs

Location: Puslinch, Ontario
Client: The County of Wellington
Details: When an existing steel truss bridge experienced a critical structural failure, our team was called in to perform emergency repairs, ensuring the safety and integrity of the structure was swiftly restored. The scope of work included the full replacement of structural steel at the bottom chord to re-establish a secure and load-bearing connection. This project demonstrates our capability to mobilize quickly on time-sensitive, safety-critical infrastructure





