Homer Watson Multi-Use Trail

Categories: Kitchener, Ontario

Location: Kitchener, Ontario

Client: The Region of Waterloo

Details: Engineered Concrete Limited constructed three new pedestrian bridges along an 8km multi-use trail, creating a continuous active transportation connection from St. Mary’s High School to Conestoga College in Waterloo Region. Our scope included the full substructure work. All Footings, abutments and all supporting concrete elements — as well as the complete installation of each bridge. Additionally, an existing structure located near the Ken Seiling Waterloo Region Museum was rehabilitated with new overhangs and removal and replacement of barrier walls.